Skip to main content

Manager Planner: What It Is and When to Use It

What is Manager Planner?

Manager Planner is a schedule planning tool designed specifically for manager-level shifts. It allows you to plan 4–5 weeks at a time, using multiple views to balance who works when, which roles are covered, and whether you meet compliance rules. Once you’re happy with your plan, you can load it into the live Schedule where day-of adjustments are made.

Key things Manager Planner helps you do:

  • Build manager schedules faster by working several weeks at once.

  • Ensure all management shifts and critical roles are covered every day.

  • Catch overtime, maximum hours, visa, or role-based issues before publishing.

  • Balance workloads fairly across managers (hours, consecutive days, weekends off).

  • Coordinate coverage across teams and weeks using reusable patterns and copy tools.


How Manager Planner fits with the Schedule

Think of Manager Planner and the Schedule as two connected but distinct workspaces:

  • Manager Planner:

    • Used for advance planning (4–5 weeks out).

    • Focused on manager shifts and coverage patterns.

    • Shows planning-specific tools like planning status, copy, and summary panels.

    • While weeks are in Draft, you can freely add, edit, drag and drop shifts.

    • Click on "4 Weeks 5 Weeks"

  • Schedule:

    • Used for live or near-live scheduling (this week and next).

    • Includes all staff, not just managers.

    • After you load a planned week, further edits are made here.

    • Changes you make in the Schedule sync back so you can compare planned vs actual later.

    • Click on "Mon 3 	 Tue 4 	 Wed 5 	 Thu 6 	 Fri 7 	 Sat 8 	 Sun 9   Notes 	 + Add note... 	 + Add note... 	 + Ad..."

A useful mental model for using Manager Planner

  • Plan in Manager Planner → Load → Operate and adjust in the Schedule → Learn and improve next plan.

When to use Manager Planner vs. the Schedule

Use Manager Planner when:

  • You are planning manager coverage 2–5 weeks in advance.

  • You want to check overall coverage patterns (opens, closes, weekends, holidays).

  • You want to reuse a successful week by copying it forward.

  • You are reviewing fairness across the management team.

Use the Schedule when:

  • You are adjusting shifts for this week or next (sick calls, swaps, last-minute changes).

  • You are editing non‑manager shifts.

  • You need to quickly fix a single day or shift rather than the whole month.

Prerequisites: What needs to be configured

Before managers can use Manager Planner effectively, ensure:

  • Manager Planner is enabled in your business-level settings.

    • Click on the settings cog in the bottom left corner

      • Click on the button "Settings"

    • Then navigate to your business level settings (only Owner operators and Group admins have access to this setting)

      • Click on the button "McDonald's Mackenzie Home"

    • Navigate to the Scheduling menu and click the schedule settings dropdown

      • Click on the link "Scheduling Configuration"

  • You can enable or disable the manager planner using the togglel. Blue means the feature is enabled.

    • Click on "MANAGER SHIFT PLANNER  Enabled"

  • You can set your Primary Role (main manager role) using the Primary Schedule Job dropdown.

    • Click on the link "FLOOR selected"

  • Tasks/role configurations are set for the Tasks/Role view. This is where you can select the core manager tasks.

    • Click on "ADMINISTRATION/CASH CLOSING OPENING TRUCK DELIVERY"

If you can’t see Manager Planner in your navigation, reach out to your CSM for assistance.

Did this answer your question?