Skip to main content

Creating, Editing, and Reusing Manager Shifts


Manager Planner lets you create new shifts, edit existing ones, and copy successful patterns forward so you don’t have to rebuild each schedule from scratch.

Creating new shifts

Features Include:

  • Assigning shift start and end times

  • Adding multiple roles to one shift

  • Marking the “Manager on Shift”

  • Receiving compliance warnings in real time

  • Drag-and-drop editing

Example

One manager can work:

  • Opening Manager from 6 AM–11 AM

  • Floor Manager from 11 AM–3 PM

The system tracks all role changes within the same shift automatically.

The video below will walk you through the creation of new shifts in the manager planner. You can also review step-by-step instructions below

Creating Shifts In Manager view:

  1. Locate the manager and day where you want to add a shift.

    1. Click on "Bertie Smith"

  2. Click into the empty cell to create a new shift.

    1. Click here

  3. The shift will default to your configured Primary Role (e.g. Shift Manager).

    1. Click on "FL"

  4. Set the start and end times for the shift.

    1. Click on "FL ⁦ 08 : 00 ⁩ - ⁦ 15 : 15 ⁩ 7:15"

  5. Optionally add or adjust roles (for multi-role shifts) and designate the manager running the shift, if that’s part of your setup.

    1. Click on the button "+ Add Schedule job"

Best practices:

  • Use standard start/end times aligned with your dayparts or trading hours.

  • Avoid unnecessary micro-variations in shift times; consistency makes coverage easier to understand.

  • If your business uses “Manager running the shift”, make sure each open and close has one clearly designated.


Editing and moving shifts

To edit an existing shift:

  1. Click the shift tile.

    1. Click on "FL+2 · 16:30 - 1:00"

  2. Adjust start time, end time, or roles as needed.

    1. Click on "Date 07 / 10 / 2026 FL ⁦ 16 : 30 ⁩ - ⁦ 17 : 00 ⁩ 0:30 G ⁦ 17 : 00 ⁩ - ⁦ 00 : 00 ⁩ 7:00 C ⁦ 00 : 00 ⁩..."

  3. Save to apply your changes.

    1. Click on "Date 07 / 10 / 2026 FL ⁦ 16 : 30 ⁩ - ⁦ 17 : 00 ⁩ 0:30 G ⁦ 17 : 00 ⁩ - ⁦ 00 : 00 ⁩ 7:00 C ⁦ 00 : 00 ⁩..."

To move a shift:

  • Drag and drop the shift tile to a different day or another manager, buy clicking on the shift, then using your mouse to drag it to another day or manager.

    • Click on the button "FL+2 · 16:30 - 1:00"

  • The system will automatically update totals and any related panels.

    • Click on "Edit Planned Shift Wed, Jul 08, 2026 Date 07 / 08 / 2026 FL ⁦ 16 : 30 ⁩ - ⁦ 17 : 00 ⁩ 0:30 BS ⁦ 17 :..."

Why to use editing and drag-and-drop to:

  • Respond to known constraints (school timetables, second jobs, etc.).

  • Move shifts away from managers who are approaching overtime or long streaks.

  • Fill gaps without recreating shifts.

Handling multiple roles within a shift

In some setups, a single manager may perform multiple roles (e.g. Opening Manager in the morning, Floor Manager in the afternoon).

Within a single shift:

  • You can assign more than one role and indicate how time is split if needed.

    • Click on "BS"

  • The system can track which role the manager is performing in each part of the shift, which flows into your Tasks/Role view and coverage checks.

    • Click on "A ADMINISTRATION/CASH"

This allows you to:

  • Reflect reality more accurately when managers change roles during a shift.

  • Ensure that each role shows the correct number of hours for planning and analysis.


Copying Planned Shifts

One of the biggest time-saving features is the ability to copy schedules from previous weeks.

How It Works

Managers can:

  • Copy successful schedules into future weeks

  • Preserve assignments or copy shifts as unassigned

  • Detect conflicts before copying

How It Helps

Instead of rebuilding schedules from scratch, managers can reuse proven scheduling patterns and only make adjustments where needed.

Copying planned shifts to future periods

The Copy Planned Shifts tool in the Actions menu is one of the biggest time-savers in Manager Planner.

Basic steps:

  1. Navigate to the destination week (where you want the copied plan to appear).

    1. Click on the button "3"

  2. Open the Actions menu and choose Copy Planned Shifts.

    1. Click on "Copy Planned Shifts"

  3. Select one or more source weeks from a previous period. You can select a different source week, per week you are copying to. You can use the same week starting date for multiple weeks.

    1. Click on "Week starting Jul 6"

  4. Choose copy options:

    • Preserve assignments: keep the same managers assigned to the same shifts.

    • Unassign and flag: copy the shift structure but leave them unassigned, so you can assign managers fresh.

      • Click on "COPY OPTIONS Preserve assignments - Keep the same assignees when copy Unassign overlapping planned s..."

  5. Confirm to run the copy.

When to preserve assignments vs unassign:

  • Preserve assignments when:

    • Your manager team is stable, and the future weeks look similar to the source weeks.

    • You want to quickly repeat a proven pattern (for example, a normal trading period).

  • Unassign and flag when:

    • You are copying across periods with different trading patterns (e.g. holidays, promotions).

    • Manager availability has changed (new hires, departures).

    • You want to avoid accidentally scheduling someone who will be on leave.

After copying, always scan for:

  • Conflicts (availability, leave).

  • Coverage gaps due to changes in trading hours or events.

  • Fairness issues introduced by copying an old pattern into a new reality.

Did this answer your question?